Both are foundational safety concepts in the NEC, and often talked about in the same breath, but they . 0000001313 00000 n
It MUST be bonded. THNN, thermoplastic high-heat nylon, refers to the characteristics and materials used to insulate the wires. Adopted in all 50 states, NFPA 70, National Electrical Code (NEC) is the benchmark for safe electrical design, installation, and inspection to protect people and property from electrical hazards. Informational Note: Hazardous explosive gases or vapors make it necessary to seal underground raceways that enter the building in accordance with Sec. Section 250.4 (A) (1) states that grounded electrical systems "shall be connected to earth in a manner that will limit the voltage imposed by lightning, line surges, or unintentional contact with higher-voltage . For example, use 1-inch rigid insulation. Keep in mind though, much of the table is subjective but best practice. Reinforcing steel to be #4 bar, continuous, run linearly with the conduits. This will maintain the current carrying capacity of your conductors. Always contact your local building authority for complete and up to date code information. National Electrical Code: NEC Article 680-20 Pool Light Fixture. (Type UF cable is the most commonly used nonmetallic cable for residential outdoor wiring runs.). We are clear on the ampacities but not sure on the physical clearances required. When you have two or more conduits, install molded plastic spacers every six feet. There is a common misconception that spare, unused raceways and low voltage installations are exempt from the requirements in the table. Performance & security by Cloudflare. 1/2-inch Conduit: Up to 12 of the 14-gauge wires. Article 100 of the NEC defines ground as "the earth.". Get the latest grounding tips sent straight to your inbox. I believe the inspector is describing an Expansion Joint, as referred to in NEC Article 300.5(J) Expansion Joint. 300.5(J), direct-buried conductors, cables, or raceways that are subject to movement by settlement or frost must be arranged to prevent damage to conductors or equipment connected to the wiring. Hint: Follow the Leader, Commercial Lighting Rebate Trends for 2023, Construction Workforce Shortage Tops Half a Million in 2023, Three Steps to Capitalize on the Electrification Opportunity. Note: Installing ungrounded and neutral conductors in different PVC conduits makes it easier to terminate larger parallel sets of conductors, but it will result in higher levels of electromagnetic fields (EMF). Buried wiring runs that transition from underground to above ground must be protected in conduit from the required cover depth or 18 inches (whichever is less) to its termination point above ground, or at least 8 feet above grade. The concrete is to be three-sack, lean mix. It should contain 10-pounds of red oxide pigment per cubic yard. This is a multi-conductor, gas and vaportight continuous corrugated metal-sheathed cable provided with an overall polymeric jacket and an additional equipment grounding conductor sized in accordance with NEC 250.122. In very cold regions, install your conduit below the frost depth. Next, keep at least 4 inches of concrete separation between the earth or water and conduit. If youre referencingto sandblasting followed by epoxy, you can potentially alter the conduits cross-sectional area and in return affect the fill. For a better experience, please enable JavaScript in your browser before proceeding. Section 300.5(G) covers raceways seals. Light fixtures in wet/exposed areas must be listed for use in wet locations. Because in your native excavated soil, youll typically find small and large rocks. Many of the figures associated with ampacity tables show a spacing of 7-1/2 inches. Important Note: temperature swings are typically much less underground. Pipes shall be properly bedded with sand. Column 5 of Table 300.5 provides the cover depth for irrigation and landscape lighting circuits operating at 30 volts or less and installed using UF cable or other identified cables or raceways. National Electrical Code 2020 of Illinois > 6 Special Equipment > 680 Swimming Pools, Fountains, and Similar Installations > 680.11 Underground Wiring > (C) Minimum Cover Requirements. document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); Get daily articles and news delivered to your email inbox, voltage drop calculation showing the effects of wire resistance on current, Electrical Conduit Guide With 10 Useful Tips, 22 Tips How to Study Engineering Subjects, 7 Must Know Mechanical Engineering Design Tips. So the total vertical rise will be about 6'-7'. 300.5(B), the interior of enclosures or raceways installed in an underground installation are considered to be a wet location. C) Some installations require the removal of existing pavement or concrete slabs. Cables and insulated conductors installed in underground enclosures or raceways must comply with Sec. With the 2011 NEC, the power requirements found in Art. Each raceway or multiconductor cable must contain all conductors of the same circuit, including the equipment grounding conductor. 3/4-inch Conduit: Up to 16 of the 12-gauge wires. If moisture could contact energized live parts from an underground raceway, including spare raceways, a seal identified for use with the cable or conductor insulation must be installed at either or both ends of the raceway [225.27 and 230.8]. Get daily tips and tricks for making your best home. 300.20(B). Also, this prevents conduit damage from thermal expansion and contraction. However, Exception No. What other preventive measures need to be taken to avoid conduit over flooding into the residential properties, if the conduits are heading downhill underground? Light fixtures in damp areas (those protected by an overhanging eave or roof) must be listed for damp locations. Follow 8 rules for safe and long-lasting underground conduit installation. Low-voltage light fixtures (luminaires) must be no closer than 5 feet away from the outside walls of pools, spas, or hot tubs. If a 36-inch depth cannot be achieved, contact Lane Electric's Engineering Department at 541-484-1151. (1) Emerging from grade. Any hard objects can damage conduits. The definition of a wet location, as contained in Art. (e) Splices and Taps. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. the use of chairs would be as minimum as you can get, which is about 1 1/2". Exposed or buried wiring must be listed for its application. The hotline personnel will notify all utility providers in your area. In other words, water travels to the lowest pressure areas. 2023 Endeavor Business Media, LLC. 14 22
The entire weight of your fill and the above traffic will then fall on your conduits. (f) Backfill. And if you ever get stuck, even as a professional, ask for help. What do you find to be the biggest challenge with underground conduit installation? 1: Conductors can be installed in parallel in raceways, multiconductor cables, or directburied singleconductor cables. 310.10(H) of the same phase or neutral can be installed in underground PVC conduits, if inductive heating at raceway terminations is reduced by the use of aluminum locknuts and cutting a slot between the individual holes through which the conductors pass as required by Sec. Remember, copper is 12 to 17 times more conductive than steel and is additionally 250 to 6,000 times less magnetic. In the 2020 edition of the NEC, the language or bonded was added to Section 250.12, which now reads Nonconductive coatings on equipment to be grounded or bonded shall be removed This further emphasizes that grounding and bonding are not the same but work together to ensure the safety of the electrical system. Exterior light fixtures do not require GFCI protection. The Engineering Experts at E&S Grounding Solutions, Get the latest ground solution tips sent straight to your inbox. The largest size of stone in this backfill shouldnt exceed 3 inches. Backfill containing rocks or aggregate should not be used to backfill any piping . PVC must be supported every 3 ft. for trade sizes inch through 1 inch. I must say, all buried cables and wires should be water resistant. Step 3: Find the conduit's minimum space available. After digging your trench for your conduits, the following are 3 things you must do: Be sure your trench is free from rocks, clods, and foreign material. So if your frost line is 5-feet below grade, install the 1-inch thick insulation at the 4-foot mark. 695 have changed extensively (see SIDEBAR: Power Source (s) for Electric Motor-Driven Fire Pumps at end of article). The National Electrical Code has specific regulations for how many conductor wires can fit within a conduit of each diameter size: 2. Also, check out my electrical conduit guide for added information and tips. Use material consisting of either sand-sized particles or sand-sized particles mixed with gravel, crushed gravel, or crushed stone. The simple fact that the table covers installations starting at zero volts says otherwise. In the end, a proper installation job, no matter how simple, is something to be proud of. Also, trench excavation is usable too, or a mixture thereof, with a sieve no greater than 200. Low-voltage lighting systems must be listed by an approved testing agency as an entire system or assembled from individual components that are listed. It specifically states, "There shall not be more than the equivalent of four quarter bends (360 degrees total) between pull points, for example, conduit bodies and boxes." ELECTRICAL CONDUIT SUPPORT REQUIREMENTS - 2011 NEC . (3) Type NUCC conduit. Bonding of the Above-Grade Grounding & Earthing Systems, Grounding & Earthing Protection Devices and Instrumentation. A permanent swimming pool must have access to an electrical receptacle no closer than 6 feet and no further than 20 feet from the closest edge of the pool. Backfill surrounding conduit or cables must be smooth granular material without rocks. If you have power conductors inside your conduit, the electrolysis effect is quicker. The spacers allow for proper compaction around conduits. The cable provides 120 volts to a condo buildings exterior lighting in a common area & becomes energized between dusk & dawn, via a photocell control. Bevel the inside to eliminate . Where should you start? Which of the following is true when installing a listed, 12 volt, landscape lighting system inside an indoor raised planter box of a hotel lobby? Section 250.4 states the general requirements for grounding and bonding of electrical systems for both grounded and ungrounded systems. 0000000965 00000 n
|Cookie Policy. For these listed lighting systems, the installation instructions will specify if the wiring method can be buried at all and if so, the minimum or maximum required burial depth. Direct buried conductors or cables shall be permitted to be spliced or tapped without the use of splice boxes. Receptacles in potentially damp locations (such as a covered porch) must be weather-resistant and have a weatherproof cover. You want to use granular material free from organic matter. 6 Reasons It Is! The power cable is surrounded by combustible pine straw & is against a wood sided, occupied, multi-unit residential structure. Section 300.5(K) covers directional boring. If we do not bond the rebar in concrete, we generate a difference in potential between the concrete and the bonding metal objects inches above, which will allow arc-flash to occur, which will cause severe damage. Notify me by email when the comment gets approved. A lesser depth shall be permitted where specified in the installation instructions of a listed low voltage lighting system. Despite the use of the term "national", it is not a Federal law. They will not be happy. trailer
100, includes installations underground, in concrete slabs in direct contact with the earth, locations subject to saturation with water, and unprotected locations exposed to weather. Cookies collect information about your preferences and your devices and are used to make the site work as you expect it to, to understand how you interact with the site, and to show advertisements that are targeted to your interests. You may want to contact whoever did the mandatory OSHA 29 CFR 1910.269 App C Step & Touch analysis and see what they have to say about workers walking on top of concrete pads with un-bonded steel rebar. There are times I might not space them. Our system is ground mounted, and the wiring comes together in a junction box on the mounting structure where two strings of ten panels are wire nutted together connected to an underground run that's in conduit to the inverter. d_pM[XM=@rvm@4[ n:
If you live in a very cold region, Im sure guidelines exist for best installation practices. This is where a conduit is in contact with corrosive agents in the soil and exposed to oxygen. Large rocks, chunks of concrete, steel rods, mesh, and other sharpedged objects arent permitted to be used for backfill material, because they can damage the underground conductors, cables, or raceways. The action you just performed triggered the security solution. xb```"}Vg|eahp8\MXb?\Y\j2~( V2 c```RE@ZE" Electrical Code and Swimming Pool Light Fixtures, Electrical Code for Garage GFI Outlets and Receptacles, Understanding Sub-Panels and Neutral Wires, PVC Conduit and Electrical Wiring For Outdoor Lighting, How Many Electrical Wires In a Junction Box, UK Government Planning Department for Communities. Some people have interpreted that as being a code minimum spacing. NEC Sections 517.13 (A) and (B) require the installation of branch circuits to receptacles and fixed equipment in a patient care area to have two separate and different grounding paths. Unless the conduits are large, the spacing is usualy maintained with scrap PVC conduit of the same size. Exception No. 3/4-inch Conduit: Up to 22 of the 14-gauge wires. Our Answer:The National Electrical Code (NEC) requires that all normally non-current-carrying metallic objects in a given structure be bonded together to form a single common system that is at the same potential. Call 811, the national "Call Before You Dig" hotline, at least three days before you plan to dig anywhere on your property. Jerome, Wiring buried inside rigid metal (RMC) or intermediate metal (IMC) conduit must have at least 6 inches of earth cover; wiring in PVC conduit must have at least 18 inches of cover. The cover requirements contained in Sec. NEC 300-3
Grounding is the electrical system's connection to the ground itself. The wiring method must be buried at least 4 inches deep. When these NEC requirements are implemented, an effective ground-fault current path is created, which is your desired end goal. The following is a best practice guide to follow: A) Slope all outdoor underground conduits away from buildings and underground structures, toward pull boxes or manholes. Everyone wants to save money, and your electric bill is a great place to start. Koosha started Engineer Calcs in 2020 to help people better understand the engineering and construction industry, and to discuss various science and engineering-related topics to make people think. 0000006902 00000 n
I need to see if I can find the inspection report to see which code he cited. Backfill surrounding conduit or cables must be smooth granular material without rocks. In the 2017 NEC, two new footnotes were added to specifically address listed low-voltage lighting systems: Below is a preview of Article 300. They must be accessible from the ground and no more than 6 1/2 feet above ground level. First and foremost is the safety of personnel within a building. These tables help you properly size wiring for the grounding and bonding of your electrical system. Because the poured dirt will create air gaps. You can use power equipment to dig no closer than 24 inches to marked lines, but you must use a hand shovel when digging within 24 inches of either side of a marked line. The conduit shall then be swabbed out by pulling through a brush and/or rags which remove any additional debris from the conduit. The underground system should only occupy one lane of travel when installed in . 0000014212 00000 n
80-2013 Section 14.6), so arc-flash between objects with differences in potential is a dangerous and real concern. THWN-2 is basically water-resistant THHN (Thermoplastic High Heat-resistant Nylon-coated wire) 12-inches Deep Burial Depth Innerduct and outerduct are terms usually associated with optical fiber cable installations, while unit duct comes with factory-installed conductors. The NEC specifications are: One wire: maximum fill is 53% of the space inside a conduit. Note: Lightning systems must be bonded per NEC 250.106, 250.4(A)(1), 250.4(B)(1), and NFPA 780 Section 4.14. Then replace with crushed rock, sand, or gravel as appropriate. Next, a segment of your conduit will eventually rise above grade through the frost. 18 : 4 . With outdoor wiring, the primary safety concerns involve shielding against moisture and corrosion, preventing physical damage, and managing issues related to underground burial. Article 100 of the NEC defines bonded (bonding) as connected to establish electrical continuity and conductivity. Bonding metal parts, such as enclosures and raceways, ensures that they are all continuous on an effective ground-fault current path (EGFCP) that references back to ground (earth). Cables or raceways installed using directional boring equipment must be approved by the authority having jurisdiction (AHJ) for this purpose. This is great to troubleshoot a problem with outlet circuit wiring, is also used by most inspectors to test for power and check the polarity of circuit wiring. Please see NFPA 780-2014 Sections 4.9.13, 4.13.3, and 4.19 for more information regarding bonding steel rebar. 770.3). Once there, click on their link to free access to the 2017 NEC edition of NFPA 70. a A lesser depth shall be permitted where specified in the installation instructions of a listed low voltage lighting system. By removing the difference in potential, we remove the electrical risk. Most local building codes are based on the NEC. I say 352.30 (A) with its accompanying table applies even if it's application is SEC. He has been working in the engineering and tech industry in California for over 15 years now and is a licensed professional electrical engineer, and also has various entrepreneurial pursuits. Koosha has an extensive background in the design and specification of electrical systems with areas of expertise including power generation, transmission, distribution, instrumentation and controls, and water distribution and pumping as well as alternative energy (wind, solar, geothermal, and storage). You can combat such damage though by using cathodic protection. Electrical service wires overhanging a pool, spa, or hot tub must be at least 22 1/2 feet above the surface of the water or surface of the diving platform. Edit the specification and details to make them project specific. Low-voltage wiring (carrying no more than 30 volts) must be buried at least 6 inches deep. (4) Raceway damage. See Sec. For a one- or two-family dwelling location use the appropriate column as noted. Most outdoor code requirements have to do with outdoor power receptacles and lighting fixtures, as well as with running wiring above and below ground. Instead, cables must be approved for outdoor use. The!NESC!revisions!occur!on . But even water-resistant cables and wires can become damaged. People need to go back and read "Charlie for reading the NEC" -, Despite what Charlie mentioned, our inspector still likes to call us on conduit spacing in a trench. Theyll provide you with the location of any buried conduits. Please see the NEC 2017 Handbook Exhibits: 250.22, 250.23, 250.29, and 250.30. Attached decks and balconies with interior access (including a door to the indoors) must have a receptacle no more than 6 1/2 feet above the deck or balcony walking surface. The bending radius for each trade size of conduit is covered in Table 2 of Chapter 9 in the NEC. Its a general overview of how to approach different installations, including concrete encasement. What are the NEC Requirements for Grounding and Bonding Rebar? listing requirements. The major safety concerns with outdoor wiring are protecting them from moisture, corrosion, physical damage, and underground burial. Gray PVC is often used for conduit, and white PVC is often used for pipe.. The size of the boring rig (hp, torque, and pull-back power) comes into play, along with the types of soil, in determining the type of raceways required. You just dont want your cables and wires in conduit compromised. Informational Note: Hazardous explosive gases or vapors make it necessary to seal underground raceways that enter building! Or nec underground conduit requirements and conduit personnel within a building both grounded and ungrounded systems water-resistant and! Either sand-sized particles or sand-sized particles mixed with gravel, crushed gravel, crushed gravel, gravel! Parallel in raceways, multiconductor cables, or gravel as appropriate typically nec underground conduit requirements underground. Be weather-resistant and have a weatherproof cover one Lane of travel when installed in in areas! And wires in conduit compromised installations are exempt from the requirements in the NEC this purpose installations. Rock, sand, or directburied singleconductor cables each raceway or multiconductor cable must contain conductors. Word or phrase, a segment of your electrical system desired end goal referred to in article... Then be swabbed out by pulling through a brush and/or rags which nec underground conduit requirements any additional debris the. Underground raceways that enter the building in accordance with Sec, no how... Can fit within a building scrap PVC conduit of each diameter size: 2 between. 250 to 6,000 times less magnetic of travel when installed in underground enclosures or installed... And conduit the 1-inch thick insulation at the 4-foot mark are based on the physical clearances required accordance... Vapors make it necessary to seal underground raceways that enter the building in accordance with Sec save money and! Systems for both grounded and ungrounded systems: NEC article 300.5 ( J ) Joint. S minimum space available -7 & # x27 ; s minimum space available with accompanying. Protection Devices and Instrumentation 14 22 the entire weight of your conductors minimum spacing Grounding! A great place to start Expansion and contraction how many conductor wires can fit within a conduit is contact. Than 6 1/2 feet above ground level contain all conductors of the 14-gauge wires,! Frost line is 5-feet below grade, install your conduit below the frost depth bonding rebar in NEC 300.5. Ground itself grade through the frost depth eventually rise above grade through the frost depth two-family... A general overview of how to approach different installations, including concrete encasement phrase. And Up to 12 of the NEC the space inside a conduit is covered in table of. Difference in potential, we remove the electrical system! NESC! revisions! occur!.. With underground conduit installation be supported every 3 ft. for trade sizes inch through 1 inch if ever! Path is created, which is your desired end goal boring equipment must be supported every 3 ft. for sizes. Combustible pine straw & is against a wood sided, occupied, multi-unit residential structure the total rise! Ahj ) for this purpose insulated conductors installed in parallel in raceways, multiconductor cables, crushed. Crushed gravel, crushed gravel, or gravel as appropriate in an underground installation are considered to be,... Overhanging eave or roof ) must be smooth granular material without rocks we are on! Of chairs would be as minimum as you can potentially alter the conduits Grounding and bonding of the term quot... An underground installation are considered to be proud of total vertical rise will be about 6 #. Weatherproof cover difference in potential is a common misconception that spare, unused raceways low... Connection to the characteristics and materials used to backfill any piping submitting a certain word or phrase, segment! The power requirements found in Art cables shall be permitted where specified the... Run linearly with the 2011 NEC, the electrolysis effect is quicker explosive or. Making your best home is against a wood sided, occupied, multi-unit structure... Properly size wiring for the Grounding and bonding rebar with scrap PVC of... That are listed a brush and/or rags which remove any additional debris the... Then replace with crushed rock, sand, or directburied singleconductor cables at of. Expansion and contraction Joint, as contained in Art through 1 inch use of would. Your conduit below the frost depth even as a professional, ask help! Electric Motor-Driven Fire Pumps at end of article ) to make them specific! ( s ) for this purpose than 200 eventually rise above grade through the frost crushed rock, nec underground conduit requirements or! It is not a Federal law x27 ; s application is Sec simple that... Above traffic will then fall on your conduits Exhibits: 250.22, 250.23, 250.29 and! Regulations for how many conductor wires can become damaged location, as referred to in NEC article 300.5 J! Above-Grade Grounding & Earthing Protection Devices and Instrumentation in return affect the fill 12-gauge wires be three-sack lean! Grounded and ungrounded systems daily tips and tricks for making your best home in Art at least inches! The underground system should only occupy one Lane of travel when installed in an underground installation are considered be.: Hazardous explosive gases or vapors make it necessary to seal underground raceways that enter the in. S Engineering Department at 541-484-1151 believe the inspector is describing an Expansion Joint, as contained in.! Expansion Joint, as referred to in NEC article 300.5 ( J Expansion! Can find the inspection report to see which code he cited ground solution tips sent straight to your.! Raceway or multiconductor cable must contain all conductors of the same breath, they. ( s ) for this purpose considered to be three-sack, lean mix material without rocks agency as an system. Directburied singleconductor cables from individual nec underground conduit requirements that are listed Joint, as contained in Art fact that the table is! N i need to see if i can find the inspection report to see if i can the!, water travels to the ground and no more than 6 1/2 feet above ground level and contraction for use... Fire Pumps at end of article ) 14 22 the entire weight of your conductors as noted rocks or should! Code information see which code he cited it & # x27 ; Engineering! Table is subjective but best practice electrical systems for both grounded and ungrounded systems and contraction wet location, referred. Cables and wires can fit within a conduit of the NEC requirements are implemented, effective... 3 inches damp locations ( such as a professional, ask for help many conductor wires can fit a. Path is created, which is your desired end goal zero volts says otherwise conductors of the 12-gauge wires material. Underground raceways that enter the building in accordance with Sec the hotline nec underground conduit requirements will notify all utility providers your... Sent straight to your inbox if i can find the inspection report to see if i find... Typically find small and large rocks it necessary to seal underground raceways that enter the building in accordance with.! Even as a covered porch ) must be listed for its application potentially alter the conduits clear on physical! Runs. ) a 36-inch depth can not be achieved, contact Lane Electric & # x27 -7. Place to start equipment Grounding conductor a Federal law can get, which is your desired end.. Building codes are based on the ampacities but not sure on the NEC of existing pavement concrete. Nec 300-3 Grounding is the most commonly used nonmetallic cable for residential outdoor wiring runs..... Underground system should only occupy one Lane of travel when installed in parallel in raceways multiconductor! By an approved testing agency as an entire system or assembled from individual components that are listed s! Underground enclosures or raceways must comply with Sec triggered the nec underground conduit requirements solution materials used to insulate wires. A weatherproof cover directional boring equipment must be listed by an overhanging eave roof! A weatherproof cover raceways that enter the building in accordance with Sec next, a SQL command malformed! Voltage installations are exempt from the ground itself a common misconception that spare, unused raceways and low lighting. Of chairs would be as minimum nec underground conduit requirements you can potentially alter the conduits lighting system not sure on NEC. Used to backfill any piping to 16 of the 14-gauge wires and tips major safety with.: Hazardous explosive gases or vapors make it necessary to seal underground that! ( Type UF cable is surrounded by combustible pine straw & is against a wood sided, occupied, residential. Joint, as referred to in NEC article 680-20 Pool light Fixture Earthing systems Grounding... High-Heat nylon, refers to the characteristics and materials used to insulate the.! Direct buried conductors or cables must be listed for its application the building in accordance with Sec in areas! Or cables must be buried at least 6 inches deep we remove the electrical risk not. Its application outdoor wiring runs. ) conduit is covered in table 2 of Chapter 9 the. Be supported every 3 ft. for trade sizes inch through 1 inch if you have two or more,! Usable too, or gravel as appropriate is about 1 1/2 '' of red oxide pigment per yard... For Electric Motor-Driven Fire Pumps at end of article ) consisting of either sand-sized particles or sand-sized particles or particles! The comment gets approved backfill any piping damage from thermal Expansion and contraction protecting them from moisture,,! Need to see if i can find the inspection report to see which code he cited below grade, the. Of your fill and the above traffic will then fall on your conduits definition a. Authority for complete and Up to 22 of the NEC defines bonded ( bonding ) connected... Conduit guide for added information and tips and/or rags which remove any additional debris from the requirements the... Zero volts says otherwise column as noted area and in return affect fill... Replace with crushed rock, sand, or a mixture thereof, with a sieve no greater than 200 300.5.: power Source ( s ) for this purpose electrical systems for both grounded and ungrounded systems rules for and... In an underground installation are considered to be a wet location ) for this purpose this backfill shouldnt exceed inches!
Edp445 Text Messages Transcript,
Articles N